The natural gas released or burned because of the following operations is also affected by this ruling:
Meters are a great low-cost alternative to a full switch from venting to flaring:
- BOEMRE already estimates that the vented emissions are quite low (0.31% including platform and non-platform sources)
- They estimate that a mandated switch from venting to flaring would only reduce total US greenhouse gas (GHG) emissions by less than 0.05%.
- In order to avoid the overwhelming costs of such a mandated switch, they have requested more and clearer data to be provided to get a more accurate measure.
Meters are required on new and existing facilities that process more than 2,000 bopd or more. BOEMRE estimates that each facility will need 2-3 meters, one for each pressure system (High Pressure, Intermediate Pressure, and Low Pressure).